OEM SOLUTIONS - 6 CHEMINS DE L'ACHETEUR - MOQ 500 PAIRES

Private Label Barefoot Shoes for Your Business

Barefoot shoe OEM/ODM for six business channels. MOQ: 500 pairs per color per style. First reply within 24 hours. Explore the channel and product pages below.

6 Solutions Parcours de l'acheteur
500 paires MOQ
ISO 9001 - BSCI Certifié ISO 9001 · Audité BSCI
24 heures First Reply
Barefoot Sourcing

Four Details Behind a Barefoot Shoe Order

Quantity, shoe geometry, sampling and factory credentials affect the scope of a barefoot shoe project.

MOQ by color and style

Keytop’s minimum is 500 pairs per color per style. The minimum applies separately to each color and style in a collection.

Zero-drop product range

The seven barefoot categories have 0mm drop and a wide toe box. Stack heights vary by category, from the 4mm running style to the 6–8mm boots.

Factory credentials and their scope

Keytop holds ISO 9001 for its quality management system and has completed BSCI and Sedex social audits. GRS applies to eligible recycled-material options.

Sample and bulk timing

Samples take 10–21 calendar days after design confirmation. Bulk production takes 45–60 calendar days after sample approval and deposit.

The channel pages below connect these terms to brand, distribution and retail projects.

6 Solutions pour les acheteurs

Quel type d'entreprise construisez-vous ?

Des modèles commerciaux différents nécessitent des preuves différentes. Choisissez le chemin qui correspond à votre canal - chaque page approfondit le MOQ, le processus et ce que Keytop fait pour votre modèle spécifique.

Marque indépendante

Vous lancez votre première ligne de chaussures pour pieds nus ?

Barefoot shoe OEM/ODM for a new brand collection, starting at 500 pairs per color per style. Explore the brand-development page for the project route.

Marque indépendante OEM
Commerce électronique

Vendre sur Amazon FBA ou dans votre propre magasin ?

Private-label barefoot footwear for marketplace and direct-to-consumer sellers. Explore the e-commerce page for product development and packaging options.

Label privé OEM
Commerce de gros

Distribuer des chaussures pour pieds nus sur les marchés ?

50,000 pairs/month capacity. MOQ is 500 pairs per color per style. The wholesale page covers collection sourcing for distributors.

Prix de gros
Fitness

Equiper un studio, une salle de sport ou une salle de CrossFit ?

Zero-drop training shoes for studio and fitness brands. MOQ is 500 pairs per color per style; the training category has a 4mm stack height.

Chaussures Studio
Financement participatif (crowdfunding)

Vous menez une campagne Kickstarter ou Indiegogo ?

Barefoot footwear for crowdfunding founders, with a 500-pair minimum per color per style. Samples take 10–21 calendar days after design confirmation.

Campagne OEM
Vente au détail

Acheter pour un magasin de course à pied ou un magasin de plein air ?

Seven barefoot categories for specialty footwear retailers, from running shoes to boots and sandals. Explore the retailer page for collection sourcing.

Approvisionnement des détaillants
Capacités de l'usine

Keytop’s Terms for a Barefoot Shoe Project

MOQ, sampling, production, payment and tooling terms in one place.

Quantité minimale de commande

500 paires par couleur et par style.

Each color and style has its own minimum quantity.

Sample development

Samples take 10–21 calendar days after design confirmation. Sample fee: USD 200 per sample, refundable against the bulk order.

Bulk production

45–60 calendar days after sample approval and deposit.

FOB, CFR, CIF and DDP shipping terms are available.

Factory credentials

ISO 9001 quality management; BSCI and Sedex social audits.

GRS applies to eligible recycled-material options.

Payment

Standard reference: T/T, 30% deposit and 70% before shipment.

Final payment terms depend on the quotation.

Tooling ownership

Once the client has paid the tooling fee, the molds belong to the client.

OEM/ODM development covers brand-owned barefoot footwear projects.

Comment ça marche

Du premier message à votre porte - 4 étapes

The project moves from an inquiry to a sample, then bulk production and shipment.

Examen du périmètre

Racontez-nous votre dossier

Send product type, quantity, target market and customization needs. First reply within 24 hours; quote within 48 hours.

10 à 21 jours

Approuver l'échantillon

Samples take 10–21 calendar days after design confirmation.

45 à 60 jours

Démarrage de la production en vrac

Bulk production takes 45–60 calendar days after sample approval and deposit.

Shipping Terms

Les chaussures quittent l'usine

Nous expédions FOB, CFR, CIF ou DDP.

Questions courantes

Ce que les marques demandent généralement en premier

Keytop travaille avec 6 types d'acheteurs : les marques indépendantes qui lancent leur première ligne, les vendeurs de commerce électronique Amazon FBA et DTC, les distributeurs en gros, les studios de fitness, les créateurs de campagnes de crowdfunding et les acheteurs de détail spécialisés. Le MOQ commence à 500 paires pour tous les canaux.
500 paires par couleur et par style.
Samples take 10–21 calendar days after design confirmation. The sample fee is USD 200 per sample, refundable against the bulk order.
Keytop holds ISO 9001 for its quality management system and has completed BSCI and Sedex social audits. GRS applies to eligible recycled-material options.
Keytop supplies barefoot footwear for private-label e-commerce projects. Product development and packaging options are covered on the e-commerce page.
Once the client has paid the tooling fee, the molds belong to the client.
Bulk production takes 45–60 calendar days after sample approval and deposit.
Yes. MOQ applies separately to each style and color: 500 pairs for each. For a quote, include the product types, quantities by style and color, size range and target market. First reply within 24 hours; quote within 48 hours.
Keytop is based in Jinjiang, Quanzhou, Fujian, China.

Commencez ici

Start Your Barefoot Shoe Project

Envoyez votre cahier des charges afin que l'équipe puisse examiner la faisabilité, le périmètre et l'étape suivante appropriée.

  • Certifié ISO 9001 · Audité BSCI
  • Samples: 10–21 Days After Design Confirmation